This client had a small bathroom with a with a tiny square shower and a corner cabinet that was impossible to use and reach for storage. The shower floor was breached and water was standing under the shower pan and seeping into the subfloor. The bathroom had to be completely gutted and rebuilt, including the plumbing. We used a semicircle shower design and created a custom river rock floor and the corner cabinet was replaced with hanging baskets for towel storage. We replaced the sink vanity with a pedestal sink to create more space in the overall floor plan.
Custom River Rock Floor
Space Saving Pedestal Sink
Mirror and Light Fixture
Ceramic Tile
Custom River Rock Shower Floor
BRANDING PROJECT NO 6
A SUBTITLE
Bathroom remodel with tub
The client asked to remove tile from the wall behind the toilet and sink and replace the sheetrock and paint. They also asked that the old wall tile around the tub be removed. We replaced the sheetrock with waterproof panels and new tile. We installed new tub and sink fixtures and a new vanity and painted all walls. The wall switches were all replaced and a new baseboard border added in front of the tub.
Tile Install Above Bathtup
Tile Install Above Bathtub Back Wall
New Bathtub Completed
Wall Tiles Removed and Replaced with Sheetrock/Paint
New Vanity Install
Vanity View from Hallway
Light Switch Replaced
Bathroom Remodel Completed
Spa Bathtub install & Bathroom Remodel
This project involved demolition of an existing bathroom, installation of new tile floor, spa bathtub, and tile above and around the new spa tub.
Spa Tub Tile Install
Spa Tub and Tile Floor Install
Tile Border Design
Special Custom Tile Design
Completed Tub With Custom Design
Bathtub Recaulk
This was a small job, but an important one. The caulking was coming off from around this client's bathtub. So, we re-caulked the tub.
Bathtub Re-caulking
Marble shower floor redesign
This second floor shower floor was leaking and caused damage in a closet on the first floor of the home. The shower floor was completely removed and new marble was installed preserving the original walls, fixing the leak.